Speaking at an expanded government meeting on 15 January, Turkmen President Gurbanguly Berdimuhamedov set tasks for the government of Turkmenistan for 2009in the sphere of industry and fuel-energy sector. They are as follows:
- natural gas extraction should reach 75 bn cubic meters, and gas exports should meet contractual obligations;
- oil extraction should reach 10.9 million tonnes;
- power generation should reach 15.8 bn kWh, with 2,6 bn kWh for export purposes;
- production of mineral fertilizers should reach 805,300 tonnes;
- reconstruction of facilities producing carbamide and ammonium at the Maryazot production association should be completed;
- construction of a potash fertilizer plant in Lebap province should start;
- two iodine and bromine production units should be constructed at the Balkan iodine plant;
- the construction industry should be fully supplied with construction materials produced locally, i.e. to increase production of non-metallic materials to 9,964 mln cubic meters; concrete constructions to 245,6 thousand cubic meters; haydite to 57,5 thousand cubic meters.
GBAO, Rasht Valley districts are the first to fulfill their autumn conscription campaign targets
The resumed regular flight from Dushanbe to Khorog postponed due to bad weather
How do you know you're low-income?
The metro in Dushanbe will be underground, but the start date for construction is still unknown.
A woman from Khatlon province jailed for fightings alongside ISIL in Syria
Armenian troops boycott ongoing CSTO military drill in Kazakhstan
Russian, former participants of SVO in Ukraine, jailed for torturing a 6-yerar-old Tajik boy
Tajikistan’s GDP growth projected to reach 8.0 percent in 2024, says EBRD report
More stringent regulation of migrants in Russia lowers remittances to Tajikistan
The European Union supports relations in the field of agricultural exports
All news
Авторизуйтесь, пожалуйста