DUSHANBE, January 31, 2014, Asia-Plus – Tajikistan’s power system will operate in routine regime despite unfavorable weather forecast for early February, Tajik Minister of Energy and Water Resources Usmonali Usmonov announced at a news conference in Dushanbe on January 31.
“The country’s power system operates in routine regime and it will operate in routine regime despite coming cold weather,” the minister said.
“New hydropower power plants with total capacity of nearly 1,000 megawatt have been introduced into operation in the country in recent years,” said Usmonov. “They are Sangtuda-1 HPP (670 MW), Sangtuda-2 HPP (220 MW), Pamir-1 HPP (14 MW) and a number of small power plants with total capacity of 28 megawatt.”
Besides, the Dushanbe combined heat and power (CHP) plant now operates and the first unit of the coal-powered Dushanbe-2 CHP plant has been introduced into operation this month, the minister noted.
According to him, current water level in the reservoir powering the Norak hydroelectric power plant (HPP) is 50 centimeters lower than in January 2013 but one meter higher when compared to January 2012.
We will recall that the Tajik Hydrometeorology Center forecasts temperatures to drop to -11ºC in early February.





GBAO and Khatlon province complete spring draft target early
Chronicle of the month: March, 2026
Donald Trump states US ready to end war with Iran without a Deal
Kyrgyzstan launches domestic production of national currency
Windy April: weather forecast for Tajikistan
Tajikistan faces continued religious freedom challenges
The Judo Grand Slam in Dushanbe: what to expect
New developments in Isfara: schools, power substation, and coal mine opened
Iran claims drone factory in Tajikistan, but no evidence surfaces
Nuclear raid or breaking the blockade: why Trump wants thousands of Marines and paratroopers off the shores of Iran
All news